RENOVATION OF HALL OF INDUSTRY (PRAGATI MAIDAN) WITH TAPECRETE P-15
CROSS-SECTION OF RHOMBOIDAL MEMBER The free flowing concrete was required to cast in-situ for some of the rhomboidal members which had become discontinuous. The members were generally repaired after dismantling loose concrete, cleaning of the rust from main reinforcement and protecting the reinforcement both old and additional one with Tapecrete P-151 slurry coat. Proper shuttering had to be used for all levels depending on the location of the discontinuous members. PMC mortar using Tapecrete P-151 was extensively used for repair of spalled rhomboidal members, the area of spalling exceeded 1800 m2 for the Hall. Depending on the depth of Spalling two kinds of treatment were adopted for the rehabilitation work. In both the cases Tapecrete mortar was used on the exterior with 15 mm thick protecting layer. For repair of cracks, chiselling a groove and filling it with Tapecrete p-151 mortar after a PMC slurry coat was adopted for cracks running into total length of about 3000m. The cracks were generally due to rust formation on the reinforcing steel. All the rhomboidal members, joints and all the external surfaces of the external surfaces of the gunited plates were provided with an anti-carbonation and waterproofing coating by the application of Tapecrete P-151 and cement slurry coating. The work in Hall No. 3 was completed to the full satisfaction of the C.P.W.D. Authorities, who have subsequently decided to rehabilitate other Halls. |
||||||||||
|
|||||||||||