CASE STUDIES


    Rehabilitation - Calcutta Town Hall
    Sabi River Bridge
    Tarapur Atomic Power Plant 3 & 4
    GOHAR MAHAL - A HERITAGE STRUCTURE REHABILITATION
    SELECT CITY WALK NEW DELHI
    Waterproofing of Chamera Hydel Project
    Stoppage of Heavy Ingress of Water - Metro Rly
    Subterranean Soil Stabilisation by Grouting - NTPC at Singrauli
    Restoration of South Court - Rashtrapati Bhawan
    Renovation of Hall of Industry - Pragati Maidan
    Corrosion Protection to Stay - Cables-Vidya Sagar Setu/Calcutta
    Delhi Mathura Highway - Ircon
    Rehabilitation of Severely Damaged Shell Roof Structure of
    Durgapur Chemical Factory
    Rahabilitation of Gurva Griha of Shree Jagannath Temple, Puri
    Rahabilitation - Prabhukutir Housing Society, Mumbia
    Strengthening of Track Bed - Metro Rly. / Calcutta
    Calcutta Metro Railway
    Super Thermal Power Project - NTPC - Korba
    Vishakhapatnam Steel Project
    Soil Stabilisation
    Longest Head Race Tunnel Excavation done with Rock Support
    Using Resin Capsule
    Simhadri Thermal Power Project (N.T.P.C.)
    Indira Sagar Project
Before
Prabhu Kutir Dilapidated -




After
Prabhu Kutir Rehabilitated -


Post A Query  |  Contact Us  |  Site Map

Copyright (c) 2007 CICO Technologies Ltd. All Right Reserved

Site Designed by IANS Solutions